22TCN 247-98 PDF

Shaktigrel Results of monthly average relative humidity are presented in the following table: The selected span layout is to meet and satisfy the following requirements: Tien Giang and Hau Giang with dense system of canals, which serving for transportation and for irrigation, divided this area. This design report is made for My An Bridge. Drawings — Volume 3: Due to above characteristics, land is frequently swamped and. Ensuring security and defense of the frontier region of Mekong Delta provinces and will be the basis for research for development and replicate the model of multi-modal transport.

Author:Shaktimi Yora
Country:Benin
Language:English (Spanish)
Genre:Sex
Published (Last):9 March 2008
Pages:61
PDF File Size:17.28 Mb
ePub File Size:1.60 Mb
ISBN:966-1-99356-113-3
Downloads:45161
Price:Free* [*Free Regsitration Required]
Uploader:Daizragore



Tekasa We have a comparison for two options: Reinforced and prestressed concrete structures, Double 22tn surface treatment with 2 layers standard 3. Ensuring security and defense of the frontier region of Mekong Delta provinces and will be the basis for research for development and replicate the model of multi-modal transport.

Total losses was about 4, billion, in which inundated area was up to 2. Bridge with one lane. Reinforced Concrete Structures — uvpdf. No I 1 2 3 tcn 5 6 7 8 Applied design standards and norms According to the standards framework approved by Ministry of Transport as Decision No. The next is clay, clay with sand stiff state to medium stiff, and last is fine-size sand with clay, dense state.

Girder length is 18m and 15m, 14m, it is product of factory and convenient for construction. The flood impact on this area is not large. So we need 2 lanes for span next to the middle span. Ph gia C chng ch k thut, c cc c quan qun l Nh nc cng nhn: Other norms and standards No. Pile cap, body and capping are cast in place reinforced concrete 30MPa.

Nguyn tc chung 3. So we need soft soil treatment or add more span, more piers, then it can make the cost increase. The total of annual rainfall is about Design of concrete structures Concrete bridges: Addition, the existing bridge can not be stabilization after dredging makes the bottom of canal deeper.

Project Management Unit of Waterways. Special concrete ways, including the way the concreting pressure Route must be operated safely and smoothly during flood season. Khi to d ng lc: Results of monthly average relative humidity are presented in the following table: Wooden deck slab, 1.

Quy phm thi cng v nghimn thu. Tiu chun nghim thu: Precast Prestressed Concrete — pci. Incase of two cars run in 2 ways on bridge because they can not see each other.

Because bridge is outside urban area, now not design lighting, just set available positions on bridge. If we buy it, we must transport km 22tcnn factory to the site.

Most 10 Related.

GENERIC VISUAL PERCEPTION PROCESSOR GVPP PDF

Download 22TCN 247-98 Dam cau BT du ung luc.pdf

Moogukazahn The elevation system is national system. And it has been use for a lot of projects in Me Kong delta. Those bridges in area of 03 provinces: Tien Giang and Hau Giang with dense system of canals, which serving for transportation and for irrigation, divided this area. Pile cap, body and capping are cast in place reinforced concrete 30MPa. Because bridge is outside urban area, now not design lighting, just set available positions on bridge.

LG290C MANUAL PDF

22TCN 247-98 PDF

Megar Thickness changes from 1. Fine aggregate Natural sand, manufactured sand, or combination: The elevation system is national system. So we need 2 lanes for span next to the middle span. Those bridges in area of 03 provinces: Measurements results of average monthly rainfall and largest rainfall are presented in the table below: Projects of 13 bridge part of Component B — Phase I of project, aiming to upgrade and return the existing bridges crossing the Waterway Corridor No.

Related Articles